Answers are grounded in this paper and cite their sources.
SUMMARY The flow-shop sequencing problem with no wait in process and with jobs requiring dissimilar technological order for machine processing is formulated in this paper. A systematic method is suggested for obtaining the optimum solution to the sequencing problem. An example of four jobs with four technological orderings for machine processing and four machines is solved to illustrate the suggested method.
No takes yet. Share an insight, caveat, or question.
S.K. Goyal (1975) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: