Answers are grounded in this paper and cite their sources.
The increasing importance of make-to-order manufacturing, inventory reduction and resource optimisation have placed further emphasis on the growing role of scheduling in the current global business environment. Often there has been a problem of applying the mathematically rich concepts of scheduling theory to solve the real-time industrial problems – in particular the problem of job-shop scheduling. In this context, in our current work, we develop a priority-based heuristic for minimising the makespan for a turbine manufacturing industry. This heuristic gives the optimal schedule based on the dynamic priorities of the customer work orders. We also propose bounds for makespan in job-shop scheduling environment. There are a host of issues addressed by the job shop scheduling system, like resource break-down, reentrance of the jobs on the resources that are already visited by the job. Our research helps in connecting the academic theory with real-time industrial scheduling problem to get better quality results.
No takes yet. Share an insight, caveat, or question.
Dulluri et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: