Answers are grounded in this paper and cite their sources.
A methodology inspired by a game-theoretic view of the on-line control problem for job-shops is developed which allows the use of static off-line schedules in uncertain environments, and the explicit incorporation of deterministic and stochastic information concerning future disturbances. A discrete event dynamic system representation is used to formulate the control problem. The control objectives are to minimize expected makespan and deviations from an off-line schedule. Computational tractability is achieved through a graph-theoretic decomposition of the job-shop scheduling problem, the development of fast rescheduling heuristics, and efficient sampling of future events. A heuristic search algorithm is developed for problem resolution. Experimental results show that the methodology significantly outperforms existing control methods such as ‘total rescheduling’ and ‘right-shift.’ Most importantly, the control methodology demonstrates consistent performance and small CPU time requirements throughout the tests.
No takes yet. Share an insight, caveat, or question.
Leon et al. (1994) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: