Analytical and probability techniques are applied to the evaluation of substation expansion plans and transformer loading policies. The method develops the probabilities of exceeding maximum transformer temperatures and the expected loss of transformer life utilizing local historical substation load and ambient temperature environmental conditions. Alternate substation expansion plans to meet forecast area load are compared on the basis of cost versus reliability.