Ideally a production line is perfectly balanced and most efficient when all the stages have been allocated an equal amount of task times, but realistically this situation is almost impossible for a practical problem. For such an ideal situation, the just-in-time (pull system) production system holds no inventory in between the stages, such that the production process is just-in-time. The stage operation limes are random variables and the mean of each operation time has been assumed deterministic in sampling from a group of different mean operation times. Thus, because of the differences in stage operation times due to the variability of the operator's performance and/or unequal distribution of task times, the production line experiences various types of problems. In this paper we tried to see the effects of this imbalance of stage operation times in a just-in-time (JIT) production system. In addition to the implications of the simulation results, an indication for further research has been given in the conclusion.
No takes yet. Share an insight, caveat, or question.
Sarker et al. (1988) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: