Answers are grounded in this paper and cite their sources.
In this paper we present a mathematical programming model for the Kanban system in a deterministic multi-stage capacitated assembly-tree-structure production setting. We discuss solution procedures to the problem and address three special cases of practical interest.
No takes yet. Share an insight, caveat, or question.
Bitran et al. (1987) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: