Answers are grounded in this paper and cite their sources.
This paper develops a lot size model for a single-stage production system producing defective items that need to be reworked. Because the rate of defectives and the demand rate are usually not known precisely in practice, we fuzzify both rates with t
No takes yet. Share an insight, caveat, or question.
Shekarian et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: