Answers are grounded in this paper and cite their sources.
Purpose This paper considers and discusses analytically the optimal preventive maintenance (PM) policies of aged plants such as fossil‐fired power plants. Design/methodology/approach Shocks are assumed to occur at a nonhomogeneous Poisson process and the total damage due to each shock is additive. The system undergoes the PM at a certain time or the total damage exceeds a managerial level. The expected cost rate until PM is derived and optimal policies which minimizes it are discussed. Findings There exists a unique optimal time ( T *) or managerial level ( k *) which minimizes the expected cost rate. But there does not exist a positive pair ( T *, k *), simultaneously. Research limitations/implications The damage occurrence distribution is assumed to be nonhomogeneous Poisson one. Practical implications Useful methods to consider the optimal PM policies for power plant engineers. Originality/value This paper contributes to users of aged power plants economically and practically.
No takes yet. Share an insight, caveat, or question.
Qian et al. (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: