Answers are grounded in this paper and cite their sources.
The contour maps of the error of historical and parametric estimates of the global minimum risk for large random portfolios optimized under the Expected Shortfall (ES) risk measure are constructed. Similar maps for the VaR of the ES-optimized portfolio are also presented, along with results for the distribution of portfolio weights over the random samples and for the out-of-sample and in-sample estimates for ES. The contour maps allow one to quantitatively determine the sample size (the length of the time series) required by the optimization for a given number of different assets in the portfolio, at a given confidence level and a given level of relative estimation error. The necessary sample sizes invariably turn out to be unrealistically large for any reasonable choice of the number of assets and the confidence level. These results are obtained via analytical calculations based on methods borrowed from the statistical physics of random systems, supported by numerical simulations.
No takes yet. Share an insight, caveat, or question.
Caccioli et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: