Answers are grounded in this paper and cite their sources.
By applying the loop gain analysis technique, a forbidden region for the polar plot of the ratio of impedances at the interface between two cascaded power subsystems is determined. A method of transforming the forbidden region into a load impedance specification for a given source impedance is developed. The method assures system stability and minimal performance degradation of the distributed power system, while allowing impedance overlap at the interface.>
No takes yet. Share an insight, caveat, or question.
Wildrick et al. (1995) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: