Answers are grounded in this paper and cite their sources.
Conflict detection and resolution models typically consider train separation distances based on a number of blocks corresponding to conventional fixed-block signalling systems. However, modern distance-to-go railway signalling systems, such as the European Train Control System (ETCS), use braking curve supervision, resulting in train- and speed-dependent train separation distances. This paper proposes a modelling approach that incorporates train- and speed-dependent brake indication points and the resulting blocking times, enhancing conflict detection and resolution models for distance-to-go signalling. By integrating these enhancements into the state-of-the-art RECIFE-MILP model, a mixed integer linear programming formulation explicitly representing fixed-block distance-to-go signalling is obtained. The enhanced model is evaluated considering the state-of-practice fixed-block distance-to-go signalling system ETCS Level 2, and is compared with the original model for conventional fixed-block signalling in two real-world case studies. Results show that the shorter train separation under distance-to-go signalling leads to different rescheduling decisions, including a significant number of reroutings and some reorderings. With that, reductions in total train delay are achieved for 98% and 55% of the respective case study instances. While the mean reductions are below 1%, reductions of up to 7% are observed. These findings illustrate the operational relevance of incorporating distance-to-go principles into conflict detection and resolution modelling.
No takes yet. Share an insight, caveat, or question.
Versluis et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: