This is the authors' abstract. We don't add key points for this paper.
The main haul roads can significantly affect the cost associated with hauling ore and waste to the concentrating mill or waste dump, so finding optimal routes for main haul roads development is very important for opening-up the mountainous open pit. In this study, we propose a new method to search the optimal route for main haul roads development using A* algorithm based on a 3D terrain model of the mountainous surface mine.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Un Chol Han (2022) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: