Answers are grounded in this paper and cite their sources.
Simultaneously considering train scheduling problem and maintenance planning problem with uncertain travel time, we propose a two-stage integrated optimization model for the sunset-departure and sunrise-arrival trains (SDSA-trains). Specifically, in the first stage, we obtain an optimal solution of the SDSA-trains under each scenario, which leads to the minimum total travel time. In the second stage, a robust SDSA-train schedule is generated based on the optimal solutions of the first stage. The key is that we consider two operation modes to solve the conflict between the SDSA-trains and the maintenances. Some state variables are used to deal with train operation mode selection. Furthermore, some linearization techniques are used to formulate a mixed-integer linear programming (MILP) model. Finally, numerical experiments are implemented to prove the effectiveness of the proposed model and optimization method.
No takes yet. Share an insight, caveat, or question.
Zhang et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: