Answers are grounded in this paper and cite their sources.
This paper presents an experimental investigation on the short-term creep recovery of cement paste at micrometre length scale. Micro-cantilever beams were fabricated and tested with 8 different loading series using the nanoindenter. It is found that cement pastes show high recovery ratios (>80%) even subjected to very high stress levels. Relatively lower recovery ratios and non-linear creep were also observed for w/c 0.4 samples under high stress levels. A good agreement is found between the results predicted using the linear superposition principle and the experimental results except for the measured non-linear creep in w/c 0.4 samples. It is suggested that the short-term creep recovery may be associated with the microscale stress redistribution or the reversible internal water movement. The observed non-linear creep under the highest stress level may be due to the higher density of microcracks generated during the loading stage, which may further promote the water transfer.
No takes yet. Share an insight, caveat, or question.
Gan et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: