This paper deals with two most important problems, from both practical and theoretical standpoints, arising in sequencing mixed-model assembly lines. Such lines have become core components of modern repetitive manufacturing, and just-in-time (JIT) manufacturing in particular. One problem is to keep the usage rate of all parts fed into the final assembly as constant as possible (the “level-scheduling problem”), while the other is to keep the line's workstation loads as constant as possible (the “car-sequencing problem”). In this paper the combined problem is formulated as a single-integer programming model. The LP-relaxation of this model is solved by column-generation techniques. The results of an experimental evaluation show that the lower bounds are tight.
No takes yet. Share an insight, caveat, or question.
Drexl et al. (2001) studied this question.
Synapse has enriched one closely related paper. Consider it for comparative context: