Answers are grounded in this paper and cite their sources.
The BHP Jansen project team and the Wood Operations Analysis group have developed a static model and a dynamic model of the Jansen potash production and logistics chain. The static model more rapidly estimated the production capacity than the dynamic model, but the latter was needed for understanding the interfaces in the chain. Both models were used during the project’s prefeasibility and feasibility study stages during which the project’s net present value increased by about $500 million. This modeling success was credited to strong governance, input accountability, relevance of key performance indicators, and a robust approach to trade-off valuation.
No takes yet. Share an insight, caveat, or question.
Sylvie C. Bouffard (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: