In order to build a time‐based organization a firm should: outline a time‐based strategy, assess the feasibility of the strategy, and plan the changes. The implementation stage requires drastic changes in company culture, structure, systems, and the way work is accomplished.
No takes yet. Share an insight, caveat, or question.
Paul J. Stonich (1990) studied this question.