Answers are grounded in this paper and cite their sources.
For pt.IX see ibid., vol.7, no.6, p.5 et seq. (1991). An overview of engineering practice related to partial discharge (PD) measurements in gas-insulated substations (GISs) is provided. The following questions are addressed: why measure PD in GIS?; in which phases of the life cycle should PD be measured?; what PD measurements are presently available?; and, what results can be expected under various measurement conditions?.>
No takes yet. Share an insight, caveat, or question.
Baumgärtner et al. (1992) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: