Answers are grounded in this paper and cite their sources.
A comprehensive series of field tests was made on the Tennessee Valley Authority-South Central Electric Companies' (TVA-SCEC) 160-mile, 500-kV interconnecting line and associated terminal equipment. The tests included: energizing at controlled points on voltage wave and deenergizing shunt reactor compensated line with transient voltage limiting breaker; switching line and 1200- MVA transformer with a 161-kV transient voltage limiting breaker; applying solid persistent and transient arcing faults to line while carrying load; and high-speed reclosing after fault clearing. High- speed motion pictures were combined with oscillograms to obtain and relate data. The methods, instrumentation, and results are given in this paper.
No takes yet. Share an insight, caveat, or question.
Nickelson et al. (1967) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: