A linear programming method is suggested for evaluating and scheduling water conservation measures for deferring or avoiding a single anticipated capacity expansion project. The method is contrasted with long‐run marginal cost techniques and demonstrated for the case of a small city contemplating conservation to defer a water treatment plant expansion alternative.
No takes yet. Share an insight, caveat, or question.
Jay R. Lund (1987) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: