A multi-cluster tool is composed of a number of individual cluster tools linked by buffering modules (BMs). The capacity of a BM can be one or two. Aiming at finding an optimal one-wafer cyclic schedule, this paper explores the effect of two-space BMs on the performance of a multi-cluster tool. A Petri net (PN) model is developed to model it by extending resource-oriented PNs. The dynamic behavior of robot waiting and tasks, process modules, and buffers is well described by the model. This paper shows that there is always a one-wafer cyclic schedule that reaches the lower bound of the cycle time of a process-bound tool. Furthermore, a closed-form algorithm is revealed to find such a schedule for the first time for such multi-cluster tools. Illustrative examples are given to show the application and power of the proposed method.
No takes yet. Share an insight, caveat, or question.
Yang et al. (2014) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: