Answers are grounded in this paper and cite their sources.
Original scientific paperProduction scheduling plays a vital role in the planning and operation of a manufacturing system.Better scheduling system has a significant impact on cost reduction and minimum work-in-process inventory.This work considers the problem of scheduling n/m/F/ΣCi using Decision Tree (DT) algorithm.Since this problem is known to be strongly NP-hard, this work proposes heuristic based methodology to solve it.The advantages of DT's are that the dispatching rule is in the form of If-then else rules which are easily understandable by the shop floor people.The proposed approach is tested on benchmark problems available in the literature and compared.The proposed work is a complement to the traditional methods.Keywords: decision tree algorithm and heuristics; flow shop scheduling; total flow time Na pravilu zasnovan heuristički pristup smanjenju ukupnog protoka vremena kod programiranja radova u permutacijskoj protočnoj radionici Izvorni znanstveni članak Programiranje radova u proizvodnji je od bitne važnosti u planiranju i funkcioniranju proizvodnog sustava.Unaprijeđeni sustav programiranja značajno utječe na smanjenje troškova i minimalni broj radnih postupaka.U ovom se radu razmatra problem programiranja n/m/F/ΣCi primjenom Decision Tree (DT) algoritma.Budući da je ovaj problem poznat kao veoma NP-hard, u radu se za njegovo rješenje predlaže metodologija temeljena na heuristici.Prednosti DT-a su u tome što je pravilo otpreme u obliku If-then else pravila koja radnici u radionici lako razumiju.Predloženi je pristup testiran na repernim problemima dostupnim u literaturi i uspoređen.Predloženi rad je dodatak tradicionalnim metodama.
No takes yet. Share an insight, caveat, or question.
Balasundaram Rathinam (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: