Answers are grounded in this paper and cite their sources.
The well is the most important physical asset of any operating company in the oil and gas industry. The operator is obligated to have a certified well integrity management system (WIMS) with core components that cover all wells under its responsibility. These core components include risk assessment, well schematics and barriers, and well classification and prioritization. The purpose of developing this management system is to define the requirements and activities necessary to implement a WIMS in the production phase. All these plans are aimed at optimal and profitable extraction from oil and gas reservoirs with the least possible damage to human life, the environment, and the financial issues of the operating company. Software has been developed for this system. The information is continuously recorded and stored in this software by the operators, and managers have access to this data online. The most important part is the wells section, which will be discussed in detail. This paper provides a comprehensive review of risk assessment, potential consequences during well production operations, a complete classification of fluid flow barriers and their schematics, well classification with site-specific indicators, and well prioritization for maintenance planning based on color-coding and specific problem types. In risk assessment, the potential consequence levels are categorized into different types of damage, along with the probability and degree of occurrence of events, and subsequently, an implementation plan is presented for operationalizing it, including hazard identification. Well barriers from schematics to well barrier elements and their performance standards are explained. Then, well classification is performed using color-coding in four colors: green, yellow, orange, and red, based on indicators such as barrier status, annulus fluid type, annulus pressure, and leakage rate. System performance monitoring, maintenance, and repair of parts and equipment are also examined. Finally, the implementation of this system on one of the Middle East hydrocarbon fields with approximately 400 wells is carried out, where the status of 3 wells is red due to safety valve problem and high pressure and gas leakage of annulus and prioritized for first repair, 34 wells are orange due to choke valve problem and high pressure and without gas leakage of annulus and are of high importance for repair, 46 wells are yellow and under continuous and precise monitoring, and 223 wells are green and under monitoring. All cases have been operationally documented.
No takes yet. Share an insight, caveat, or question.
Ardakani et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: