Answers are grounded in this paper and cite their sources.
This paper presents the results of an insulation coordination study for the 500-kV Fort Martin and Yukon stations of the Allegheny Power System. The station parameters determined 1) lightning arrester rating, 2) transformer, circuit breaker, disconnecting switch, and bus support BILs, 3) minimum electrical clearances, and 4) number and location of lightning arresters.
No takes yet. Share an insight, caveat, or question.
Hileman et al. (1967) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: