Answers are grounded in this paper and cite their sources.
A basic problem in scheduling involves the sequencing of a set of independent tasks at a single facility with the objective of minimizing mean tardiness. Although the problem is relatively simple, the determination of an optimal sequence remains a challenging combinatorial problem. A number of algorithms have been developed for finding solutions, and this paper reports a comparative evaluation of these procedures. Computer programs for five separate algorithms were written and all were run on a data base designed to highlight computational differences. Optimizing algorithms developed by Emmons and by Srinivasan appeared to be particularly efficient in the comparative study.
No takes yet. Share an insight, caveat, or question.
Baker et al. (1974) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: