Answers are grounded in this paper and cite their sources.
This paper considers the hierarchical production planning (HPP) concept to solve a production planning problem in the process industry in a fuzzy environment. The adopted fuzzy HPP consists of two levels in which a fuzzy aggregate production planning (FAPP) model is developed in the first level, and then a fuzzy disaggregate production planning (FDPP) model is developed at the second level. The FAPP was reported by Omar et al. [1] and therefore, this research paper discusses the FDPP model. We formulated the disaggregate model as a fuzzy mixed-integer linear programming model that aims to develop a master production schedule in which numbers of optimal batches are developed in presence of setup time. In addition, we evaluate the performance of the FMILP by comparing its results with a previously reported approach. The findings indicate that significant cost savings were achieved by adopting the fuzzy mathematical programming approach.
No takes yet. Share an insight, caveat, or question.
Omar et al. (2021) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: