Answers are grounded in this paper and cite their sources.
Growing interest in the research of soil loss caused by human activities has attracted public attentionover the world especially for the developing countries. However, existent soil erosion estimation modelsfocused on natural than artificial conditions, and particularly the models used to estimate the soil erosionrate to the latter involves a number of uncertainties, which require further attention. To develop scientificmodels, it is necessary to extract the characteristics of soil bodies that formed in different engineeringconstruction programs. This contribution reports the results of an investigation of classifications in variousartificial programs around China. Some indexes, such as slope gradient, slope length, soil layer depth,vegetation coverage were measured for accumulated spoil and cutting edges, which were caused inthe process of construction. Soil samples were also collected from different sites representative of differenttypes of projects and distributed in different areas of China. Measurements of soil density and soil particlesize were made on these samples. Four classifications were given and related experiments, includingartificial simulation rainfall, field wind tunnel simulation were taken to calculate the influence of windfactors on erosion modulus and to estimate the change of different disturbance times. On the basis ofanalyzing, the crucial parameters to contribute soil loss were selected and the models framework usingfor calculating different types soil erosion were put forward.
No takes yet. Share an insight, caveat, or question.
Ning et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: