Answers are grounded in this paper and cite their sources.
In this study, we consider the operational problem of an urban rail transit (URT)-bus bridging service system considering the uncertainty of passengers, and formulate the problem as a two-stage stochastic programming model. In the first stage, optimal travel paths are determined to minimise in-vehicle time and transfer times. In the second stage, the assignment of passenger flow is decided to minimise the system load. To efficiently solve this model, we develop a binary particle swarm optimisation algorithm and validate its effectiveness using numerical experiments. We analyze two case studies based on Shanghai Metro. The results demonstrate that the URT-bus bridging service system achieves improvements in weighted in-vehicle and transfer times by 14.04% to 17.30%, and in system load by 11.85% to 23.83%, compared to the performance of only standard bus bridging lines. A further analysis on travel paths shows that approximately 30% of the passengers are diverted by longer paths.
No takes yet. Share an insight, caveat, or question.
Du et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: