Answers are grounded in this paper and cite their sources.
The paper aims at demonstrating that the consideration of constant start-up costs and ramps of the thermal generating units for assessing the contribution of pumped-hydro energy storage to reduce the scheduling costs of hydrothermal power systems with high wind penetration, may yield unrealistic results. For this purpose, an isolated power system is used as a case study. The contribution of a pumped-storage hydropower plant to reduce the system scheduling costs is assessed in the paper by using a hydrothermal weekly unit commitment model. The model considers different start-up costs and ramps of the thermal generating units as a function of the start-up type. The effects of including pumped hydro energy storage in the system on the integration of wind energy, and on the start-ups and capacity factors of the thermal generating units are also evaluated. The results of the paper demonstrate that the consideration of constant start-up costs and ramps of the thermal generating units yields unrealistic results, and that the pumped-storage hydropower plant may help reduce the system scheduling costs by 2.5–11% and integrate wind power and may allow dispensing with some inflexible thermal generating units.
No takes yet. Share an insight, caveat, or question.
Pérez‐Díaz et al. (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: