The sources of construction delays include engineering, construction, financial/economic, management/administrative, and force majeure. This paper presents a knowledge-based expert system dedicated to engineering-related delays. Three categories of engineering-related delays are considered in the proposed system. These are: (1) design development; (2) workshop drawings; and (3) project parties changes delays. The knowledge of the system is acquired from literature, Federation International des Ingenieurs-Conseils (FIDIC) contract forms, domain experts, as well as a questionnaire survey. Three classes of participants (consultants, contractors, and employers) have been approached to get their feedback on the cases of engineering-related delays. The design of the questionnaire and criteria for selecting participants are described. The feedback of the participants is analyzed to draw the main causes of engineering-related delays. The proposed system’s built-in rules utilize the procedure of FIDIC contract forms for both design-bid-build and design-build projects. In addition, it provides flexibility in utilizing other customized procedures. The system advises on the claim entitlement, responsibility, and compensability of claims. A case study is presented to demonstrate the capabilities of the proposed expert system.
No takes yet. Share an insight, caveat, or question.
Marzouk et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: