Answers are grounded in this paper and cite their sources.
A new heuristic based on the Nawaz–Enscore–Ham algorithm is proposed in this article for solving a permutation flow-shop scheduling problem. A new priority rule is proposed by accounting for the average, mean absolute deviation, skewness and kurtosis, in order to fully describe the distribution style of processing times. A new tie-breaking rule is also introduced for achieving effective job insertion with the objective of minimizing both makespan and machine idle time. Statistical tests illustrate better solution quality of the proposed algorithm compared to existing benchmark heuristics.
No takes yet. Share an insight, caveat, or question.
Liu et al. (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: