Answers are grounded in this paper and cite their sources.
Numerical simulation demonstrates accelerated consolidation and improved slope stability in soft clay deposits, indicating effective ground improvement using preloading with vertical drains.
This study lends a complete numerical analysis of geotechnical remediation solutions for soft soil conditions on the Tanjung Keramat Port Access Road in East Kalimantan, Indonesia. The analysis highlighted major issues presented by soft clay deposits, such as excessive settlement and potential slope instability. The site was classified into four unique zones based on soil parameters following a thorough soil assessment that included standard penetration tests (SPT), cone penetration tests (CPT), and laboratory research. For each zone, three treatment options were considered: no treatment, preloading with a 2m embankment, and preloading using prefabricated vertical drains (PVD). The investigation indicated that the preloading using the PVD approach dramatically lowered consolidation time from thousands of days to around 50-60 days while preserving post-construction settlements within acceptable ranges (less than 20mm in the first year and less than 100mm total). The safety factors for slope stability were also upgraded to meet or surpass Indonesian standards (SNI 8460:2017). This study gives important insights into the optimisation of ground improvement strategies for infrastructure construction on soft soils, particularly in tropical regions with difficult geological characteristics.
No takes yet. Share an insight, caveat, or question.
Efendi et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: