Answers are grounded in this paper and cite their sources.
This paper deals with a production planning problem typical for process industries. There the production amount of one continuous production run – referred to as a campaign – is often constrained by a lower and/or upper bound or such that it has to be in multiples of a predefined batch size. For this kind of problem, a new mixed-integer-programming model formulation is proposed that is based on a standard lot-sizing model with uniform time buckets. Thereby the concept of time continuity is integrated into a standard bucket-oriented lot-sizing model formulation. Furthermore, some algorithmic (valid inequalities) and modelling enhancements to the formulation are presented. Extensive computational tests show that this new model formulation clearly outperforms a benchmark model formulation. Moreover, they show the additional computational effort associated with different types of restrictions imposed on campaigns.
No takes yet. Share an insight, caveat, or question.
Christopher Suerie (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: