Answers are grounded in this paper and cite their sources.
The low average single-well production, resulting in low economic benefit, has become the main bottleneck of CBM development in China. In view of this issue, through case study of a CBM gas reservoir in the southern Qinshui Basin, we summarized the present status of CBM technology and development there and also pointed out some major problems in CBM development: (1) the engineering technology for the CBM development needs to adapt to the particular geological characteristics; (2) a large number of inefficient zones still exist in mature blocks in the southern Qinshui Basin; (3) single-well production can not be effectively enhanced only by increasing the fracturing scale; (4) the production of multi-lateral wells is higher, but the fulfillment rate of production capacity overall is still low; and (5) on-site management lacks scientific evidence. On this basis, we present the following suggestions for subsequent coalbed gas development: (1) the production construction mode should be changed, and the fulfillment rate of production capacity construction should be improved; (2) CBM geological research should be improved and well types and locations should be designed reasonably and scientifically; (3) main technologies should be built in a dialectical thinking mode; (4) horizontal well design should be optimized to improve the applicability of relevant technologies; (5) fracturing mode should be changed to improve single-well production; and (6) the drainage technology should be changed to improve economic efficiency.
No takes yet. Share an insight, caveat, or question.
Zhu et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: