Answers are grounded in this paper and cite their sources.
The integration of project scheduling and human resource allocation is crucial in modern project management, particularly in complex and resource-constrained environments. This study addresses the Integrated Project Scheduling and Personnel Staffing Problem (IPSPSP) with time/resource trade-offs by proposing a dual-objective optimization model that minimizes both project duration and personnel cost. To solve this problem, we introduce an adaptive hybrid algorithm combining the Non-dominated Sorting Genetic Algorithm II (NSGA-II) and Multi-Objective Particle Swarm Optimization (MOPSO). The algorithm employs hybrid encoding for activity modes, activity priority lists and personnel allocation plans, coupled with a hypervolume-based adaptive search mechanism to improve solution quality. Experimental results demonstrate that the adaptive hybrid algorithm outperforms standalone NSGA-II and MOPSO in generating schedules and optimizing resource allocation. This study makes significant contributions by presenting a novel integrated model tailored for projects, an effective adaptive hybrid optimization algorithm and a comprehensive performance evaluation, thereby advancing the field of integrated scheduling and staffing in project management.
No takes yet. Share an insight, caveat, or question.
Hu et al. (2025) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: