Answers are grounded in this paper and cite their sources.
Some variance reduction techniques utilizing the total hazard are developed to estimate the average run lengths of the cumulative sum charts through simulation when the process follows a general probability distribution. Particularly, we propose the hazard estimator and the cycle estimator. Simulation results are shown for the exponential case and these estimators are compared with the raw simulation estimator. Applicability to multivariate CUSUM schemes is briefly discussed in the conclusion.
No takes yet. Share an insight, caveat, or question.
Jun et al. (1993) studied this question.
Synapse has enriched 5 related papers. Consider them for comparative context: