Answers are grounded in this paper and cite their sources.
Insulation system in high voltage power equipment is critical to the electric power system's reliability. As a result, it's important to evaluate its functioning in order to avoid the power system outage. The most essential phenomenon to be measured in the performance assessment of insulation diagnostics is partial discharge (PD). PD in solid dielectrics could occur due to the presence of a cavity or a crack within the insulating material which could be formed during manufacturing, installing or/and operating conditions. Since internal cavities are the main source of the PD activities, insulation system degradation could be happened. Consequently, a complete failure may be occurred. In this paper, PD simulation model is performed on a rubber insulating material with a changeable diameter of artificial cylindrical cavity. A COMSOL Multiphysics software is introduced as a Finite Element Analysis (FEA) tool for PD simulation model interlinked with MATLAB software in order to investigate the influence of cavity geometry on the PD behavior in the insulating material. Simulated results indicated that PD magnitude is strongly depending on changing the cavity size inside the insulating material.
No takes yet. Share an insight, caveat, or question.
A 2022 study studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: