Answers are grounded in this paper and cite their sources.
This paper deals with the job shop problem of simultaneous scheduling of production operations and preventive maintenance tasks. To solve this problem, we develop an elitist multi-objective genetic algorithm that provides a set of Pareto optimal solutions minimising the makespan and the total maintenance cost. A deep study was made to choose the best encoding, operators, and the different probabilities. Some lower bounds of the adopted criteria are developed. The computational experiments carried out on a set of published instances validate the efficiency of the proposed algorithm.
No takes yet. Share an insight, caveat, or question.
Ali et al. (2010) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: