Answers are grounded in this paper and cite their sources.
Smart hydrogen projects are crucial for enhancing performance, efficiency, and sustainability through integrating new technologies such as the Internet of Things (IoT), but several challenges can impede their successful adoption. This study seeks to identify and prioritize IoT barriers in a hydrogen project, utilizing a fuzzy decision-making framework based on Fuzzy Step-wise Weight Assessment Ratio Analysis (F-SWARA) and Fuzzy Weighted Aggregates Sum-Product Assessment (F-WASPAS) methods. Also, this study examines sensitivity analysis and compares it with fuzzy methods to investigate the robustness. The indicators of appropriate costs for investment, technical infrastructure capacity and its development, and the possibility and ease of access to the required financial resources, with values of 0.176, 0.154, and 0.132, have the highest significance. The results show that barriers of uncertainty in the return on investment and long-term profitability of digital technologies and high initial investment costs, and limited access to sustainable financial resources, obstacles related to the protection of user privacy and data security in IoT-based platforms, and lack of guidelines for integrating IoT with other existing infrastructures and information systems, have the highest priority, respectively. Recommended actions include financial incentives, support funds, new financing tools, stronger data laws, enhanced cybersecurity, human resources training, development of standards, and interoperability projects.
No takes yet. Share an insight, caveat, or question.
Seyyed Jalaladdin Hosseini Dehshiri (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: