Answers are grounded in this paper and cite their sources.
This study developed a load forecasting system for electric market participants. Combining the least‐square support vector machine (LSSVM) and particle swarm optimisation (PSO), a LSSVM_PSO was proposed for the solving process. The loads, temperature, and relative humidity of the Taipower system were collected in the Excel Database. Data mining techniques is used to discover meaningful patterns, with the PSO applied to adjust learning rates. The forecasting error can be reduced during the training process to improve both the accuracy and reliability, where even the spikes were nicely followed. The support vector regression, LSSVM, radial basis function neural network and the proposed LSSVM_PSO were all developed and compared to check the convergence and performance. Simulation results demonstrated the effectiveness of the proposed method in a price volatile environment.
No takes yet. Share an insight, caveat, or question.
Lin et al. (2016) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: