Answers are grounded in this paper and cite their sources.
Some methods allowing for the selection of the most suitable contractor based on 26 criteria are offered. The bidding procedures of FIDIC, the international organization of consulting engineers are assessed. Contractors are evaluated by a multicriteria decision method COPRAS. The significance of the contractor evaluation criteria is determined by ranking. A description of the criteria and their rankings according to 100‐point scale are provided. A case study of selecting the contractor for the construction of a trade and entertainment centre out often bidders is also described.
No takes yet. Share an insight, caveat, or question.
Algirdas Andruškevičius (2005) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: