This is the authors' abstract. We don't add key points for this paper.
To extend the operating frequency band of earth-based interferometric gravitational wave (GW) detectors down to 1 Hz, an unconventional system is required that provides approximately a factor of one million vibration isolation for the horizontal and more for the vertical, starting at 1 Hz. To this end, a three-stage ultra-low-noise, high-performance active and passive isolation system is being designed and constructed in order to demonstrate that a high degree of reduction can be achieved for vibrations at the support points of a GW detector’s final pendulum system. The first stage of this system has been fully characterized and is the main subject of this article. It is an equilateral triangular platform, 1.1 m on a side, with a total mass of 460 kg, including the vacuum system that will contain the other two stages. Active isolation is achieved by six servocontrol loops, using signals from low-frequency displacement sensors to feed back to noncontacting force transducers. The first stage has been actively isolated from vibrations in all six degrees of freedom by at least a factor of 100 at 1 Hz and above. The system noise limitations at 2 Hz and above are roughly 2×10−11 and 5×10−11 m/Hz for vertical and horizontal translations, respectively.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Newell et al. (1997) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: