Answers are grounded in this paper and cite their sources.
The optimization procedures used in the Tennessee Valley Authority (TVA) HYDROSIM model are described. Scheduling of the TVA operated reservoir system poses a stochastic, nonlinear, multireservoir problem with both nonviolable (physical) and violable (operating) constraints. A linear programming procedure for implementing the preemptive priority constraints and a nonlinear search procedure for minimizing the power cost function are described. A guide development program based on stochastic dynamic programming is also described.
No takes yet. Share an insight, caveat, or question.
Gilbert et al. (1982) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: