Answers are grounded in this paper and cite their sources.
Case study demonstrates operational time reductions and zero direct emissions with battery-electric shunting locomotives, suggesting viability for low-speed industrial rail operations.
This single-site industrial case study compares a leased diesel shunting locomotive with a battery-electric shunting locomotive used for the same class of in-plant railway tasks at the Seza Cement Plant. The evidence base comprises plant leasing and fuel records, equipment specifications, site-reported electricity indicators, operator-reported operational observations, direct CO2 calculations, and documented occupational safety and health (OSH) functions; it is not a controlled or statistically replicated time–motion experiment. The diesel system incurred a monthly lease cost of USD 10,000 and consumed approximately 1800 L/month, equivalent to 21,600 L/year. Cross-checking the direct CO2 calculation with 2.692 and 2.683 kg CO2/L factors gives 58.1 and 58.0 t CO2/year, respectively. The approximately 24-month payback is treated as a plant-reported investment indicator and evaluated through a normalized sensitivity model because disaggregated costs for locomotive purchase, charging infrastructure, battery replacement, and historical maintenance are not available in the case-study dataset. Operational evidence is reported descriptively: the 20–40% reduction in task time is an operator-reported range rather than a statistical mean; the 7–9 min value refers to the complete 10-wagon weighing maneuver; and 25 loaded wagons (approximately 1450 t) represents the maximum documented field movement rather than a manufacturer-rated capacity. A force-balance check shows that this maximum movement is feasible only if total equivalent resistance remains below approximately 5.41 N/kN, using the 77 kN catalog tractive effort as an upper bound. The battery-electric locomotive produces no local exhaust emissions at the point of use and incorporates SIL 2 remote-control functions, a deadman function, emergency-stop controls, camera support, lighting, and warning systems; these features indicate risk-control capability but do not constitute a measured accident-rate reduction. The study therefore contributes facility-scale, evidence-bounded information for low-speed, repetitive industrial shunting within a defined operating area rather than a general proof of battery-electric superiority across railway applications.
No takes yet. Share an insight, caveat, or question.
Ozgen et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: