Answers are grounded in this paper and cite their sources.
The conventional approach to mine planning is to use a single estimated orebody model as the basis for production scheduling. This approach, however, does not consider grade uncertainties associated with grade estimation. These uncertainties have a significant impact on the net present value (NPV) and can only be accounted for when modelled as part of the production scheduling optimisation problem. In this research, a set of equally probable simulated orebodies generated through Sequential Gaussian Simulation is used as input to a stochastic optimisation model solved with genetic algorithm (GA). Grade variability is considered as part of the stochastic model. The problem definition and resource constraints are formulated and optimised using a specially designed mining-specific GA. This GA is employed to handle partial block processing through a specialised chromosome encoding technique resulting in near-optimal solutions. Two case studies are presented which compare results from the stochastic model solved with GA (SGA) and a Stochastic Mixed Integer Linear Programming (SMILP) model solved with CPLEX. For the second case study, while the SMILP model was at an optimality gap of 101% after 28 days, the SGA model generated an NPV of $10,045 M at 10.16% optimality gap after 1.5 h.
No takes yet. Share an insight, caveat, or question.
Amponsah et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: