On-time project performance is an important goal at the Oregon Department of Transportation (ODOT); pressure from two key constituents—the state legislature and trucking interests—creates an even stronger focus on this goal. Currently, statistics indicate that less than 50% of ODOT projects are completed within their originally contracted time of performance. Further, project delay causes uncertainty about exactly when traffic delays may occur on a given stretch of highway and makes it difficult to alert the public of these delays far in advance. The primary umbrella method used to ensure on-time performance in standard ODOT contracting is liquidated damages. Often this amount is difficult to determine, so the assessment value is usually a matter of some judgment. In practice, liquidated damages is not seen as an effective incentive and is thus rarely assessed. Other contracting and management methods that focus on encouraging on-time performance have been identified but are used sporadically. Implementation of a system that creates better awareness of alternative schedule delivery methods and that provides a consistent method for choosing among these methods would improve ODOT's schedule performance. Results are discussed of a research project (ODOT SPR-646) designed to enable development of a tool to assist in selection among various available alternative methods for ensuring timely project delivery, given a specific project profile, by using a selection model that is stable and scalable.
No takes yet. Share an insight, caveat, or question.
David N. Sillars (2009) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: