Answers are grounded in this paper and cite their sources.
Purpose: The output power of PV (photovoltaic) changes according to changes in the intensity of solar radiation. Therefore, the purpose of this study is to use a utility grid connected system to overcome changes in solar energy sources and loads. This is done to maintain an uninterrupted power supply to the load.Methods: In this study, we propose a grid-connected PV system with several DC-DC converters connected in parallel with several PV sources and batteries with PI control coordination. The proposed method includes two stages, namely the DC-DC converter development stage and the battery management strategy stage.Results: The study results show that within 0 seconds to 0.45 seconds the DC bus is supplied with PV. Due to the change in PV, within 0.45 seconds to 0.65 seconds the DC bus is supplied with unit-1 battery. When there is a change in the unit-1 battery, within 0.65 seconds to 0.8 seconds the DC bus is supplied with the unit-2 battery. By using PV coordination arrangements and battery units, the microgrid can still supply power to the load even if changes occur in the PV or grid.Novelty: The novelty in this study is a new microgrid configuration to increase the demand for electrical loads. The new configuration uses multi-PV and multi-battery. Multi-PV is used to supply the load and is stored in the multi-battery, while multi-battery is used at night and if there is a disturbance at the PV output.
No takes yet. Share an insight, caveat, or question.
Kusmantoro et al. (2023) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: