Answers are grounded in this paper and cite their sources.
Queueing models are commonly applied to quantify the performance of production systems. Prior research has usually focused on deriving queueing models for a specific type of interruptions. However, machines generally suffer multiple types of interruptions in practical manufacturing systems. To satisfy this need, an integrated model is proposed, in which multiple types of interruptions commonly seen on the shop floor are considered.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2011) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: