Answers are grounded in this paper and cite their sources.
To address the challenges of strong data heterogeneity, difficulties in dynamic risk assessment, and insufficient on-site decision support in the safety operation and maintenance of urban underground-pipeline networks, this study developed a mobile augmented-reality-based risk-assessment framework to improve on-site decision-making efficiency. The framework follows a three-layer technological approach: (1) a data layer employing ArcEngine to create a shapefile batch-processing program for the parallel handling of multi-source files; (2) a visualization layer establishing a Unity-based dynamic-visualization platform, supported by a scripted toolchain for automated three-dimensional model conversion from geographic information data; and (3) a decision layer integrating the Analytic Hierarchy Process with real-time positioning to dynamically evaluate pipeline network risks and generate maintenance recommendations. The feasibility of the framework was validated through field experiments in an operational urban-pipeline network. Results show that the data-layer preprocessing program significantly reduced file-processing time; the automated modeling of the visualization layer minimized manual errors and achieved centimeter-level virtual–real registration accuracy that enabled immersive interaction; and the decision layer implemented a closed-loop process of real-time localization, risk assessment, decision-making, and response, allowing prioritization of high-risk pipe segments for maintenance. By enabling multi-source data fusion, automated modeling, and dynamic risk assessment, the proposed framework improves operational efficiency and decision accuracy in pipeline-network management and provides a technical pathway for the intelligent management of underground infrastructure.
No takes yet. Share an insight, caveat, or question.
Zheng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: