Answers are grounded in this paper and cite their sources.
A method is presented which calculates approximately the electrical torque in synchronous machine at multi-phase reclosing, neglecting subtransient saliency and electrical decrements. A new digital simulation program, with some examples of digital calculations, is presented in detail which is used to analyze the transient phenomena accompanying power swings at multi-phase reclosing, after multi open conductors following the fault.
No takes yet. Share an insight, caveat, or question.
Komukai et al. (1973) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: